30m

Oi Power Simulator

v2.4 — 3D Telecom Site Power Assessment

Site Configuration

1. Radio

2. Baseband Server

3. Rectifier

4. Distribution Unit

5. Cable size to radio

6. Battery

30 m
25 °C

Power Assessment Results

DC Cable Route-
Required Gauge-
Voltage Drop-
Cable Power Loss-
Total Peak Load-
Total Average Load-
Required AC Input-
Current Rectifier Cap-
■ RU■ Servers■ Cable Loss
N+1 Redundant

Cabinet & Battery Status

Estimated Backup Time-